Project Summary

Project Scope:

Supply, Installation, Testing & Commissioning of Earthing Lightning Protection System of Package 2A Immigration Customs and Quarantine Complex (ICQC) and Package 2B ICQC External Works for Rapid Transit System Link (RTS Link) Johor Bahru – Singapore.

Project Gallery

Down conductor by Tokai
Down conductor

Installation of down conductor using tinned copper tape in accordance with MS IEC 62305, providing a continuous low-resistance path from the air termination network to the earthing system while ensuring enhanced corrosion resistance and long-term reliability

Chamber by Tokai
Chamber

Earthing chamber and cable terminations completed in accordance with MS IEC 62305, ensuring effective and durable grounding connection, and made ready for inspection and verification

Earth bar​ by Tokai
Earth bar

Completed earth bar installation with all copper tape and cable terminations properly secured, serving as a reliable central bonding point in compliance with MS IEC 62305 standard for Earthing and Lightning Protection System (EIC).

Related projects

LRT3 Bandar Utama
Light Rail Transit 3 (LRT3) Bandar Utama – Johan Setia

Mass Rapid Transit Sungai-Buloh-Kajang Line
Mass Rapid Transit Sungai Buloh – Kajang Line

Rapid Transit System Link (RTS LINK Johor Bahru – Singapore)
Rapid Transit System Link (RTS LINK Johor Bahru – Singapore)