Rapid Transit System Link (RTS LINK Johor Bahru – Singapore) Project


Project Owner

Malaysia Rapid Transit System Sdn Bhd (MRTS)

Completion Date

01/05/2025 – 30/11/2025

Project Summary

Project Scope:

Supply, Delivery, Installation Of Platform Touch Voltage Membrane System (PTVMS) for Rapid Transit System Link (RTS-LINK) Johor Bahru – Singapore. Package 4 – Bukit Chagar Station & Operation Control

Project Gallery

Primer Asphalt by Tokai
Primer & Asphalt

Application of primer and asphalt on the platform surface prior to earthing membrane installation, ensuring proper adhesion, corrosion protection, and long-term bonding performance in compliance with MS IEC 62305 requirements and project requirements.

blank
Membrane

Installation of platform earthing membrane system in accordance with MS IEC 62305, providing equipotential bonding across the platform area and ensuring effective dissipation of lightning and fault currents through the main earthing network.

Related projects

TRX-Vehicle-Security Barrier
Tun Razak Exchange

RTS-Link2-Johor
RTS Link – Johor

scientex
Scientex Packing Film