Project Summary
Project Scope:
Supply, delivery, installation, testing and commissioning of earthing, bonding for Power Supply and Distribution System (PS&DS) for LRT 3 from Bandar Utama to Johan Setia.
Project Gallery

Earthing with Conductor Connections
Completed installation of earthing for the depot turntable, with copper conductor connections established between the rotating mechanism and the main earth network to maintain low-resistance continuity and electrical safety as required by MS IEC 62305 and BS EN 50522.

Earthing Connection
Installation of earthing connection from the main earth conductor along the track to the designated track earthing point, ensuring proper bonding between the rail and the grounding network in compliance with MS IEC 62305 and BS EN 50522 standards.