Project Summary
Project Scope:
Designed, supplied, installed, tested, and commissioned a real-time Tokai Lightning Warning System (LWS) for the EcoWorld Elmina SGW 1A & 2A Hyperscale Data Center.
The scope included:
• Comprehensive lightning risk assessment and system engineering
• Supply and installation of real-time lightning detection, warning, and alarm systems
• Integration with site safety procedures and operational protocols
• Testing, commissioning, and verification of system performance under live operational conditions
All Tokai materials, components, and workmanship were fully compliant with the latest MS IEC 62305 (Parts 1–4), IEC standards, OSHA requirements, and international best practices applicable to hyperscale data Center environments.
All lightning protection and warning system components were type-tested and laboratory certified in accordance with relevant IEC standards