Project Owner
Malaysia Rapid Transit System Sdn Bhd (MRTS)
Completion Date
01/05/2025 – 30/11/2025
Project Summary
Project Scope:
Supply, Delivery, Installation Of Platform Touch Voltage Membrane System (PTVMS) for Rapid Transit System Link (RTS-LINK) Johor Bahru – Singapore. Package 4 – Bukit Chagar Station & Operation Control
Project Gallery

Primer & Asphalt
Application of primer and asphalt on the platform surface prior to earthing membrane installation, ensuring proper adhesion, corrosion protection, and long-term bonding performance in compliance with MS IEC 62305 requirements and project requirements.

Membrane
Installation of platform earthing membrane system in accordance with MS IEC 62305, providing equipotential bonding across the platform area and ensuring effective dissipation of lightning and fault currents through the main earthing network.