Light Rail Transit 3 (LRT3) Bandar Utama – Johan Setia


Project Owner

Prasarana Malaysia Berhad

Completion Date

03/01/2022 – 30/12/2025

Project Summary

Project Scope:

Supply, delivery, installation,  testing and commissioning of earthing, bonding for Power Supply and Distribution System (PS&DS) for LRT 3 from Bandar Utama to Johan Setia.

Project Gallery

Earthing Conductor Connection by Tokai
Earthing with Conductor Connections

Completed installation of earthing for the depot turntable, with copper conductor connections established between the rotating mechanism and the main earth network to maintain low-resistance continuity and electrical safety as required by MS IEC 62305 and BS EN 50522.

Earthing Connection by Tokai
Earthing Connection

Installation of earthing connection from the main earth conductor along the track to the designated track earthing point, ensuring proper bonding between the rail and the grounding network in compliance with MS IEC 62305 and BS EN 50522 standards.

Related projects

LRT3 Bandar Utama
Light Rail Transit 3 (LRT3) Bandar Utama – Johan Setia

Mass Rapid Transit Sungai-Buloh-Kajang Line
Mass Rapid Transit Sungai Buloh – Kajang Line

Rapid Transit System Link (RTS LINK Johor Bahru – Singapore)
Rapid Transit System Link (RTS LINK Johor Bahru – Singapore)