Mass Rapid Transit Sungai Buloh – Kajang Line


Project Owner

Prasarana Malaysia Berhad

Completion Date

03/01/2022 – 30/12/2025

Project Summary

Project Scope:

Supply, Delivery, Installation, Rectification, Testing & Commissioning of Earthing & Lightning Protection System from Kwasa Damansara to Kajang Station Including Line End and Kajang Depot Limit  for Mrt Sungai Buloh (Sbk) Line.

Project Gallery

MRT Sg Buloh down conductor by Tokai
Installation Down Conductor

Installation of down conductor in accordance with MS IEC 62305, providing a continuous and low-resistance path for earthing system to ensure safe dissipation of current.

MRT Sg Buloh earthing by Tokai
Earthing

Interstation earthing conductor installed to interconnect station earthing networks, providing continuous grounding and potential equalization in accordance with MS IEC 62305.

Related projects

LRT3 Bandar Utama
Light Rail Transit 3 (LRT3) Bandar Utama – Johan Setia

Mass Rapid Transit Sungai-Buloh-Kajang Line
Mass Rapid Transit Sungai Buloh – Kajang Line

Rapid Transit System Link (RTS LINK Johor Bahru – Singapore)
Rapid Transit System Link (RTS LINK Johor Bahru – Singapore)