East Cost Rail Link (ECRL)


Large-scale infrastructure requires reliable protection systems.
Project Owner

Malaysia Rail Link (MRL)

Completion Date

06/09/2023 – 30/05/2026

Project Summary

Project Scope:

Supply, Installation, Testing & Commissioning of Earthing Lightning Protection System of Stations Ancillary Buildings, Rolling Stock Depot and other Associated works.

Project Location:

Station Dungun, Station Chukai, Station Kemasik , Station Gombak, Depot Kuantan, EMU Yard Gombak, Freight Yard Dungun, Freight Yard Chukai.

Project Gallery

Chamber Interlinking by Tokai
Chamber Interlinking

Chamber interlinking works executed in accordance with approved ELPS drawings, with all copper tape links installed to maintain system integrity and low resistance path across all chambers.

Down conductor by Tokai
Down conductor

Down conductor works installation as per approved ELPS drawings, ensuring continuous electrical connection between air terminals and the main earth network to achieve effective lightning dissipation.

Bonding Ring Conductor by Tokai
Bonding Ring Conductor

Bonding ring conductor installed as per approved ELPS drawings, interconnecting all earthing chambers and down conductors to maintain a uniform potential and minimize step and touch voltage.

Chamber by Tokai
Chamber

Earthing chamber installed as per approved ELPS drawings, with copper tape and cable terminations connected using approved clamps and accessories to ensure effective grounding and long-term durability.

Roof Mesh by Tokai
Roof Mesh

Aluminium roof mesh installed in accordance with MS IEC 62305 standard for Earthing and Lightning Protection System (ELPS), ensuring a continuous and efficient air termination network fully integrated with the down conductors and earthing system for effective lightning protection.

Earth bar​ by Tokai
Earth bar

Completed earth bar installation with all copper tape and cable terminations securely connected, providing a reliable central bonding point in accordance with ELPS standards.

Related projects

East Cost Rail Link (ECRL) Earthing Lightning Protection System by Tokai
East Cost Rail Link (ECRL)

blank
MRT Rail

blank
Solar